Sale!

100 amp Service Upgrade

$1,500.00 $1,400.00

Your home has a service panel that distributes electricity to all of your home’s switches, outlets and appliances. As we add more appliances, electronic devices and other electronic conveniences, the demand for electricity increases and may be more than your electrical service panel can handle.
A common sign your home is drawing more electricity than they system can safely distribute is frequent circuit breakers tripping and flickering lights. Many Chicagoland homeowners may be plugging in thousands of dollar worth electronics into a panel that may not be able to safely serve and protect them.

Description

$1,400.00 for a 100 amp Electrical Service Upgrade (includes up to 20 new circuit breakers)
New panel, breakers (standard one- and two-pole breakers), and boards
Complete check of current and grounding
This coupon includes labor and material to install a brand new 100 AMP panel with main breaker, 20 new circuit breakers, new meter, new grounding electrode conductor and new ground rods. We even warranty our work for a period of 1 year
Not valid for cash back
Coupon cannot be applied to current or past jobs
Appointments are to be performed during normal business hours
Coupon cannot be combined with other specials or offers
Coupon is for residential service only
The new service panel will be installed in the same location as the existing panel. This offer assumes power company main meter is within 5 ft of main panel
Each additional circuit breaker (more than 20 would cost $15 each
If any Permit/City License fees and expenses are required, it will be due at the time of service
Sale price does not include correcting existing code violations or replacing service entrance cable or roof penetrations
If asphalt, concrete or brick covers the ground within 10 ft of power company main meter additional fees may apply
Possible drywall repair, spackling and or painting is NOT covered with this coupon
Sale price includes labeling all circuits using the same panel schedule as old panel.
Additional cost if cold water ground connection is more than 25 feet from the new Main Service Panel or if fishing of wire is required to in install GEC